A very tired (from the previous day's caving and walking) digging team cleared a lot of the infill from the pile by the dig face. BMa & GSm took the first underground shift and KEd & ASt the second one.
The rift straight ahead shows no signs of opening out lower down. The right-hand rift still needs further investigation.
Present: MBo, KEd, BMa, GSm, JSm & ASt
No comments:
Post a Comment