Pages

Saturday, 14 April 2007

Brickworks Dig, Penwyllt, South Wales

A busy weekend.  On the Saturday we replaced two of the wheels on the truck, pumped out the cave, removed the stacked bags from the cross-rift, started to permanently install the yellow pipes, placed cup-hooks down the main passage to hold up the cables and started to dig a 'sump pool' below the cross-rift.
On the Sunday we completed the installation of pipes and cup-hooks and continued to dig the sump pool.
More details on the dig page.

The dig team: KeEd, AnGr (Sat only), BrMa, GrSm, JoSm & ChWe

No comments:

Post a Comment