Sunday 23 March 2003

Brickworks Dig, Penwyllt, South Wales

During the weekend most of the infill was removed from below the scaffold frame. Truck repairs were necessary on the Saturday evening.

Present: PA (Sat. only), MB (Sun. only), KE, AG (Sat. only), BM, GS, JS, AS

Saturday 22 March 2003

OFD 1, Penwyllt, South Wales

The Round Trip done in reverse while the rest of the digging team were repairing the digging truck.

Present: PA, KE, AG & BM

Sunday 16 March 2003

Llanelly Quarry Pot, Clydach Gorge, South Wales

All of the downstream section including the Midsummer Night's Nightmare Streamway plus upstream to Ryan's Duck which only Paul went through. Six and a half hours of very strenuous caving. I think we were all pleased to be out.

Paul at the top of the 60ft pitch.


Paul coming out of the entrance.

Present: KE, BM & PS