Sunday 15 October 2006

OFD I and Cwm Dwr through trip, Penwyllt, South Wales

This was to have been a day on the dig to see if it would be possible to pump water into the cave along the newly discovered roof space, however when we went into the dig the water levels were too high, so instead we went caving. 

Present: KEd, BMa, DRo & CWe