Sunday, 18 August 2002

Brickworks Dig, Penwyllt, South Wales

We have started piling the fill which came in from the surface into sand bags and have built a lovely retaining wall with it up in the chamber. Looks like it should work quite well. Spoil removed down to track level as far as the turn left - Graham.

Present: MB, MC, BM, EP, GS & JS.