Saturday, 10 December 2005

Wharf Mine, Derbyshire

SRT practice for Chris.  We had intended to do the climbing shaft and had packed the rope for this, but when we arrived at the mine another group was about to set off to do this.  A swift change of plan ensued and we decided to do the engine shaft.  Unfortunately we needed a 50m rope and the longest club rope we had was was 45m.  However Brendan had thoughtfully packed 50m of 9mm rope so the trip was on.


Remind me never to to use 9mm rope again!!!!!!

Chris in one of the passages that lead off from the Engine Shaft.

PresentKEd, BMa & CWe


No comments:

Post a Comment