Saturday 28 January 2006

Brickworks Dig, Penwyllt, South Wales

The water was at 'normal level' with only a foot of so of water in the extension passage.  Pumping took less than an hour.  It was found that several tons of infill had fallen out of the roof of the cross rift exposing the ceiling and about 6 feet of passage to the right - not in the direction we want to go but another 6 feet for the survey nevertheless.  More ...
John Smith at the dig face.
Present: KEd, MCa, BMa, MNo, GSm, JSm, ASt + Garry from SWCC

No comments:

Post a Comment