The smallest dig team ever (KeEd, BrMa & DeRo) cleared out the infill which had slumped in from the cross-rift over the Winter, installed conveyer belt in the main dig passage, surveyed the system down the the cross-rift and broke through into approximately 15 feet of virgin passage! Details on the dig page.
The Team: KeEd, BrMa & DeRo
No comments:
Post a Comment