Saturday 24 March 2007

Brickworks Dig, Penwyllt, South Wales

The smallest dig team ever (KeEd, BrMa & DeRo) cleared out the infill which had slumped in from the cross-rift over the Winter, installed conveyer belt in the main dig passage, surveyed the system down the the cross-rift and broke through into approximately 15 feet of virgin passage!  Details on the dig page.

The Team:  KeEd, BrMa & DeRo

No comments:

Post a Comment