More remedial work on dig.  All of the infill from the collapse has now been cleared and the floor re-exposed in the side passage below the railway track.  We are ready now for the push forward.
John Smith clearing the side passage.
Keith Edwards in the side passage.
Present:  RBr, KEd, BMa, ASt, GSm & JSm